OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Green StreettoStony Brook

Orange Line

A direct MBTA train from Green Street to Stony Brook took a median 1.2 minutes across 156 observed trips; 90% of measured rides finished within approximately 1.8 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical1.2 min50th percentile
Slower trip1.8 min90th percentile
Scheduled1.2 minmedian timetable
On pace98%within 2 min of schedule

THE SHORT ANSWER

How long does Green Street to Stony Brook take?

The median completed ride from Green Street to Stony Brook was 1.2 minutes; the published schedule’s median was 1.2 minutes.

Based on 156 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 1.2 minutes. That was within 0 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 1.8 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Green Street to Stony Brook times by daypart

Evening rush produced the fastest median for Green Street to Stony Brook; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

1.2 min 16 trips · 100% on pace

Midday

1.2 min 41 trips · 98% on pace

Evening rush

1.2 min 33 trips · 97% on pace

Off-peak

1.2 min 66 trips · 98% on pace

MEASUREMENT SAMPLE

How Green Street to Stony Brook was measured

The Green Street to Stony Brook estimate uses 156 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →