OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Green StreettoJackson Square

Orange Line

A direct MBTA train from Green Street to Jackson Square took a median 2.2 minutes across 5,122 observed trips; 90% of measured rides finished within approximately 2.2 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical2.2 min50th percentile
Slower trip2.2 min90th percentile
Scheduled3.2 minmedian timetable
On pace100%within 2 min of schedule

THE SHORT ANSWER

How long does Green Street to Jackson Square take?

The median completed ride from Green Street to Jackson Square was 2.2 minutes; the published schedule’s median was 3.2 minutes.

Based on 5,122 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 2.2 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 2.2 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Green Street to Jackson Square times by daypart

Evening rush produced the fastest median for Green Street to Jackson Square; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

2.2 min 1,086 trips · 99% on pace

Midday

2.2 min 1,160 trips · 99% on pace

Evening rush

2.2 min 1,106 trips · 100% on pace

Off-peak

2.2 min 1,770 trips · 100% on pace

MEASUREMENT SAMPLE

How Green Street to Jackson Square was measured

The Green Street to Jackson Square estimate uses 5,122 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →