Morning rush
8.8 min 1,081 trips · 96% on paceOBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS
Green StreettoBack Bay
A direct MBTA train from Green Street to Back Bay took a median 8.8 minutes across 5,101 observed trips; 90% of measured rides finished within approximately 9.8 minutes.
Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only
THE SHORT ANSWER
How long does Green Street to Back Bay take?
The median completed ride from Green Street to Back Bay was 8.8 minutes; the published schedule’s median was 10 minutes.
Based on 5,101 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 8.8 minutes. That was within 1.5 minutes of the published schedule.
Nine out of ten measured trips finished within approximately 9.8 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.
WHEN YOU TRAVEL
Green Street to Back Bay times by daypart
Evening rush produced the fastest median for Green Street to Back Bay; Off-peak produced the slowest.
Differences can change as the rolling dataset updates.
Midday
8.8 min 1,154 trips · 95% on paceEvening rush
8.8 min 1,101 trips · 98% on paceOff-peak
8.8 min 1,765 trips · 97% on paceMEASUREMENT SAMPLE
How Green Street to Back Bay was measured
The Green Street to Back Bay estimate uses 5,101 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.
We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.
We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.
Read the complete method →MORE FROM Green Street
Trips related to Green Street to Back Bay
The Green Street to Back Bay record is accompanied by 6 other measured direct rides beginning at Green Street, each with a published median duration.