OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Green StreettoMalden Center

Orange Line

A direct MBTA train from Green Street to Malden Center took a median 29 minutes across 2,924 observed trips; 90% of measured rides finished within approximately 32 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical29 min50th percentile
Slower trip32 min90th percentile
Scheduled29 minmedian timetable
On pace90%within 2 min of schedule

THE SHORT ANSWER

How long does Green Street to Malden Center take?

The median completed ride from Green Street to Malden Center was 29 minutes; the published schedule’s median was 29 minutes.

Based on 2,924 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 29 minutes. That was within 0.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 32 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Green Street to Malden Center times by daypart

Morning rush produced the fastest median for Green Street to Malden Center; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

28 min 687 trips · 91% on pace

Midday

29 min 668 trips · 87% on pace

Evening rush

29 min 658 trips · 90% on pace

Off-peak

28 min 911 trips · 90% on pace

MEASUREMENT SAMPLE

How Green Street to Malden Center was measured

The Green Street to Malden Center estimate uses 2,924 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →