OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Green StreettoDowntown Crossing

Orange Line

A direct MBTA train from Green Street to Downtown Crossing took a median 13 minutes across 2,926 observed trips; 90% of measured rides finished within approximately 15 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical13 min50th percentile
Slower trip15 min90th percentile
Scheduled14 minmedian timetable
On pace96%within 2 min of schedule

THE SHORT ANSWER

How long does Green Street to Downtown Crossing take?

The median completed ride from Green Street to Downtown Crossing was 13 minutes; the published schedule’s median was 14 minutes.

Based on 2,926 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 13 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 15 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Green Street to Downtown Crossing times by daypart

Morning rush produced the fastest median for Green Street to Downtown Crossing; Midday produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

13 min 688 trips · 97% on pace

Midday

14 min 669 trips · 94% on pace

Evening rush

14 min 658 trips · 97% on pace

Off-peak

13 min 911 trips · 97% on pace

MEASUREMENT SAMPLE

How Green Street to Downtown Crossing was measured

The Green Street to Downtown Crossing estimate uses 2,926 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →