OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

North StationtoMission Park

Green Line

A direct MBTA train from North Station to Mission Park took a median 30 minutes across 3,494 observed trips; 90% of measured rides finished within approximately 36 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical30 min50th percentile
Slower trip36 min90th percentile
Scheduled32 minmedian timetable
On pace82%within 2 min of schedule

THE SHORT ANSWER

How long does North Station to Mission Park take?

The median completed ride from North Station to Mission Park was 30 minutes; the published schedule’s median was 32 minutes.

Based on 3,494 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 30 minutes. That was within 2 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 36 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

North Station to Mission Park times by daypart

Off-peak produced the fastest median for North Station to Mission Park; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

30 min 746 trips · 86% on pace

Midday

31 min 862 trips · 80% on pace

Evening rush

32 min 693 trips · 79% on pace

Off-peak

29 min 1,193 trips · 84% on pace

MEASUREMENT SAMPLE

How North Station to Mission Park was measured

The North Station to Mission Park estimate uses 3,494 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →