OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

North StationtoPark Street

Green Line

A direct MBTA train from North Station to Park Street took a median 6.2 minutes across 7,000 observed trips; 90% of measured rides finished within approximately 8.2 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical6.2 min50th percentile
Slower trip8.2 min90th percentile
Scheduled7.2 minmedian timetable
On pace92%within 2 min of schedule

THE SHORT ANSWER

How long does North Station to Park Street take?

The median completed ride from North Station to Park Street was 6.2 minutes; the published schedule’s median was 7.2 minutes.

Based on 7,000 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 6.2 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 8.2 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

North Station to Park Street times by daypart

Off-peak produced the fastest median for North Station to Park Street; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

6.2 min 1,370 trips · 94% on pace

Midday

6.2 min 1,818 trips · 91% on pace

Evening rush

6.8 min 1,419 trips · 88% on pace

Off-peak

5.8 min 2,393 trips · 95% on pace

MEASUREMENT SAMPLE

How North Station to Park Street was measured

The North Station to Park Street estimate uses 7,000 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →