OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

North StationtoCommunity College

Orange Line

A direct MBTA train from North Station to Community College took a median 1.2 minutes across 3,840 observed trips; 90% of measured rides finished within approximately 1.2 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical1.2 min50th percentile
Slower trip1.2 min90th percentile
Scheduled2.2 minmedian timetable
On pace100%within 2 min of schedule

THE SHORT ANSWER

How long does North Station to Community College take?

The median completed ride from North Station to Community College was 1.2 minutes; the published schedule’s median was 2.2 minutes.

Based on 3,840 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 1.2 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 1.2 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

North Station to Community College times by daypart

Evening rush produced the fastest median for North Station to Community College; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

1.2 min 704 trips · 99% on pace

Midday

1.2 min 679 trips · 100% on pace

Evening rush

1.2 min 750 trips · 100% on pace

Off-peak

1.2 min 1,707 trips · 100% on pace

MEASUREMENT SAMPLE

How North Station to Community College was measured

The North Station to Community College estimate uses 3,840 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →