OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Kendall/MITtoDavis

Red Line

A direct train took 9.8 minutes on a typical trip. On a slower-than-usual trip, allow up to 12 minutes.

Typical9.8 min50th percentile
Slower trip12 min90th percentile
Scheduled12 minmedian timetable
On pace97%within 2 min of schedule

THE SHORT ANSWER

How long does Kendall/MIT to Davis take?

Based on 6,254 direct trips between 2026-08-17 and 2026-09-15, the median observed ride was 9.8 minutes. That was within 2.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 12 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Time-of-day breakdown

Midday produced the fastest typical result in this window; Evening rush was slowest. Differences can change as the rolling dataset updates.

Morning rush

9.8 min 1,447 trips · 98% on pace

Midday

9.8 min 1,332 trips · 96% on pace

Evening rush

10 min 1,345 trips · 97% on pace

Off-peak

9.8 min 2,130 trips · 96% on pace

HOW TO READ THIS

Measured, not promised.

TransitMeter pairs vehicle stop timestamps with the schedule active for each trip. We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →