OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Kendall/MITtoSouth Station

Red Line

A direct train took 6.2 minutes on a typical trip. On a slower-than-usual trip, allow up to 7.8 minutes.

Typical6.2 min50th percentile
Slower trip7.8 min90th percentile
Scheduled7.2 minmedian timetable
On pace97%within 2 min of schedule

THE SHORT ANSWER

How long does Kendall/MIT to South Station take?

Based on 6,268 direct trips between 2026-08-17 and 2026-09-15, the median observed ride was 6.2 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 7.8 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Time-of-day breakdown

Off-peak produced the fastest typical result in this window; Evening rush was slowest. Differences can change as the rolling dataset updates.

Morning rush

6.2 min 1,281 trips · 98% on pace

Midday

6.2 min 1,636 trips · 98% on pace

Evening rush

6.8 min 1,382 trips · 93% on pace

Off-peak

5.8 min 1,969 trips · 97% on pace

HOW TO READ THIS

Measured, not promised.

TransitMeter pairs vehicle stop timestamps with the schedule active for each trip. We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →