OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Heath StreettoBall Square

Green Line

A direct MBTA train from Heath Street to Ball Square took a median 48 minutes across 3,237 observed trips; 90% of measured rides finished within approximately 56 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical48 min50th percentile
Slower trip56 min90th percentile
Scheduled51 minmedian timetable
On pace80%within 2 min of schedule

THE SHORT ANSWER

How long does Heath Street to Ball Square take?

The median completed ride from Heath Street to Ball Square was 48 minutes; the published schedule’s median was 51 minutes.

Based on 3,237 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 48 minutes. That was within 3 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 56 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Heath Street to Ball Square times by daypart

Off-peak produced the fastest median for Heath Street to Ball Square; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

48 min 622 trips · 89% on pace

Midday

49 min 785 trips · 81% on pace

Evening rush

53 min 625 trips · 61% on pace

Off-peak

45 min 1,205 trips · 83% on pace

MEASUREMENT SAMPLE

How Heath Street to Ball Square was measured

The Heath Street to Ball Square estimate uses 3,237 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →