OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Heath StreettoMission Park

Green Line

A direct MBTA train from Heath Street to Mission Park took a median 3.2 minutes across 3,373 observed trips; 90% of measured rides finished within approximately 4.2 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical3.2 min50th percentile
Slower trip4.2 min90th percentile
Scheduled4.2 minmedian timetable
On pace99%within 2 min of schedule

THE SHORT ANSWER

How long does Heath Street to Mission Park take?

The median completed ride from Heath Street to Mission Park was 3.2 minutes; the published schedule’s median was 4.2 minutes.

Based on 3,373 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 3.2 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 4.2 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Heath Street to Mission Park times by daypart

Off-peak produced the fastest median for Heath Street to Mission Park; Morning rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

3.2 min 638 trips · 99% on pace

Midday

3.2 min 819 trips · 99% on pace

Evening rush

3.2 min 652 trips · 96% on pace

Off-peak

2.8 min 1,264 trips · 100% on pace

MEASUREMENT SAMPLE

How Heath Street to Mission Park was measured

The Heath Street to Mission Park estimate uses 3,373 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →