OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Fenwood RoadtoPark Street

Green Line

A direct train took 20 minutes on a typical trip. On a slower-than-usual trip, allow up to 25 minutes.

Typical20 min50th percentile
Slower trip25 min90th percentile
Scheduled22 minmedian timetable
On pace84%within 2 min of schedule

THE SHORT ANSWER

How long does Fenwood Road to Park Street take?

Based on 3,468 direct trips between 2026-08-17 and 2026-09-15, the median observed ride was 20 minutes. That was within 2 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 25 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Time-of-day breakdown

Morning rush produced the fastest typical result in this window; Evening rush was slowest. Differences can change as the rolling dataset updates.

Morning rush

19 min 652 trips · 92% on pace

Midday

21 min 841 trips · 85% on pace

Evening rush

22 min 664 trips · 75% on pace

Off-peak

19 min 1,311 trips · 85% on pace

HOW TO READ THIS

Measured, not promised.

TransitMeter pairs vehicle stop timestamps with the schedule active for each trip. We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →