OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Fenwood RoadtoBack of the Hill

Green Line

A direct MBTA train from Fenwood Road to Back of the Hill took a median 4.2 minutes across 3,573 observed trips; 90% of measured rides finished within approximately 5.2 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical4.2 min50th percentile
Slower trip5.2 min90th percentile
Scheduled5.2 minmedian timetable
On pace99%within 2 min of schedule

THE SHORT ANSWER

How long does Fenwood Road to Back of the Hill take?

The median completed ride from Fenwood Road to Back of the Hill was 4.2 minutes; the published schedule’s median was 5.2 minutes.

Based on 3,573 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 4.2 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 5.2 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Fenwood Road to Back of the Hill times by daypart

Midday produced the fastest median for Fenwood Road to Back of the Hill; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

4.2 min 738 trips · 99% on pace

Midday

4.2 min 880 trips · 99% on pace

Evening rush

4.8 min 701 trips · 99% on pace

Off-peak

4.2 min 1,254 trips · 100% on pace

MEASUREMENT SAMPLE

How Fenwood Road to Back of the Hill was measured

The Fenwood Road to Back of the Hill estimate uses 3,573 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →