OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

DavistoKendall/MIT

Red Line

A direct MBTA train from Davis to Kendall/MIT took a median 10 minutes across 6,284 observed trips; 90% of measured rides finished within approximately 12 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical10 min50th percentile
Slower trip12 min90th percentile
Scheduled11 minmedian timetable
On pace95%within 2 min of schedule

THE SHORT ANSWER

How long does Davis to Kendall/MIT take?

The median completed ride from Davis to Kendall/MIT was 10 minutes; the published schedule’s median was 11 minutes.

Based on 6,284 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 10 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 12 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Davis to Kendall/MIT times by daypart

Off-peak produced the fastest median for Davis to Kendall/MIT; Morning rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

10 min 1,343 trips · 96% on pace

Midday

10 min 1,643 trips · 96% on pace

Evening rush

10 min 1,334 trips · 92% on pace

Off-peak

9.8 min 1,964 trips · 94% on pace

MEASUREMENT SAMPLE

How Davis to Kendall/MIT was measured

The Davis to Kendall/MIT estimate uses 6,284 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →