STATION REPORT · SOMERVILLE

Davis

Red Line

Across 30 service days, Davis recorded a 82/100 reliability score, a 5.1-minute typical train gap, and 16.4% long gaps from 12,593 station observations in the official dataset.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Rolling operational summary

Station score82/100Mostly steady
Typical gap5.1 minbetween observed trains
Long gaps16.4%over 1.5× schedule
Observations12,593station stop records

DIRECT JOURNEYS

Direct trips measured from Davis

TransitMeter publishes 21 direct destination measurements from Davis; waiting and transfer time are excluded.

Times below cover rides completed on one train.

STATION SIGNAL

What the Davis score means

Davis scored 82/100 (Mostly steady) from 12,593 observations, with a 5.1-minute median gap and 16.4% long gaps.

It is a rolling operational summary, not a real-time service alert.

See the formula and limits →