STATION REPORT · SOMERVILLE
Davis
Red Line
Across 30 service days, Davis recorded a 82/100 reliability score, a 5.1-minute typical train gap, and 16.4% long gaps from 12,593 station observations in the official dataset.
Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Rolling operational summary
82/100Mostly steady
Station score82/100Mostly steady
Typical gap5.1 minbetween observed trains
Long gaps16.4%over 1.5× schedule
Observations12,593station stop records
DIRECT JOURNEYS
Direct trips measured from Davis
TransitMeter publishes 21 direct destination measurements from Davis; waiting and transfer time are excluded.
Times below cover rides completed on one train.
To Harvard3.8 min6,286 tripsTo Kendall/MIT10 min6,284 tripsTo Central7.8 min6,283 tripsTo Charles/MGH12 min6,281 tripsTo Park Street14 min6,281 tripsTo Broadway20 min6,278 tripsTo Andrew22 min6,278 tripsTo JFK/UMass25 min6,275 tripsTo Porter1.2 min6,274 tripsTo South Station18 min6,270 tripsTo Alewife2.8 min6,262 tripsTo Downtown Crossing16 min6,252 tripsTo Fields Corner30 min3,138 tripsTo Savin Hill27 min3,137 tripsTo Shawmut32 min3,136 tripsTo North Quincy31 min3,134 tripsTo Wollaston33 min3,134 tripsTo Quincy Center36 min3,134 tripsTo Quincy Adams39 min3,131 tripsTo Ashmont35 min3,130 tripsTo Braintree44 min3,127 trips
STATION SIGNAL
What the Davis score means
Davis scored 82/100 (Mostly steady) from 12,593 observations, with a 5.1-minute median gap and 16.4% long gaps.
It is a rolling operational summary, not a real-time service alert.
See the formula and limits →