OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

AssemblytoGreen Street

Orange Line

A direct MBTA train from Assembly to Green Street took a median 23 minutes across 2,921 observed trips; 90% of measured rides finished within approximately 26 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical23 min50th percentile
Slower trip26 min90th percentile
Scheduled25 minmedian timetable
On pace94%within 2 min of schedule

THE SHORT ANSWER

How long does Assembly to Green Street take?

The median completed ride from Assembly to Green Street was 23 minutes; the published schedule’s median was 25 minutes.

Based on 2,921 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 23 minutes. That was within 2 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 26 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Assembly to Green Street times by daypart

Off-peak produced the fastest median for Assembly to Green Street; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

23 min 658 trips · 98% on pace

Midday

23 min 664 trips · 92% on pace

Evening rush

24 min 684 trips · 94% on pace

Off-peak

23 min 915 trips · 94% on pace

MEASUREMENT SAMPLE

How Assembly to Green Street was measured

The Assembly to Green Street estimate uses 2,921 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →