STATION REPORT · SOMERVILLE

Assembly

Orange Line

Across 30 service days, Assembly recorded a 91/100 reliability score, a 5.6-minute typical train gap, and 7.7% long gaps from 7,680 station observations in the official dataset.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Rolling operational summary

Station score91/100Steady
Typical gap5.6 minbetween observed trains
Long gaps7.7%over 1.5× schedule
Observations7,680station stop records

DIRECT JOURNEYS

Direct trips measured from Assembly

TransitMeter publishes 18 direct destination measurements from Assembly; waiting and transfer time are excluded.

Times below cover rides completed on one train.

STATION SIGNAL

What the Assembly score means

Assembly scored 91/100 (Steady) from 7,680 observations, with a 5.6-minute median gap and 7.7% long gaps.

It is a rolling operational summary, not a real-time service alert.

See the formula and limits →