OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Warren StreettoAmory Street

Green Line

A direct MBTA train from Warren Street to Amory Street took a median 11 minutes across 3,418 observed trips; 90% of measured rides finished within approximately 13 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical11 min50th percentile
Slower trip13 min90th percentile
Scheduled11 minmedian timetable
On pace88%within 2 min of schedule

THE SHORT ANSWER

How long does Warren Street to Amory Street take?

The median completed ride from Warren Street to Amory Street was 11 minutes; the published schedule’s median was 11 minutes.

Based on 3,418 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 11 minutes. That was within 0.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 13 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Warren Street to Amory Street times by daypart

Off-peak produced the fastest median for Warren Street to Amory Street; Midday produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

11 min 659 trips · 88% on pace

Midday

11 min 896 trips · 86% on pace

Evening rush

11 min 673 trips · 93% on pace

Off-peak

10 min 1,190 trips · 86% on pace

MEASUREMENT SAMPLE

How Warren Street to Amory Street was measured

The Warren Street to Amory Street estimate uses 3,418 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →