OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Union SquaretoReservoir

Green Line

A direct MBTA train from Union Square to Reservoir took a median 46 minutes across 3,133 observed trips; 90% of measured rides finished within approximately 53 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical46 min50th percentile
Slower trip53 min90th percentile
Scheduled47 minmedian timetable
On pace70%within 2 min of schedule

THE SHORT ANSWER

How long does Union Square to Reservoir take?

The median completed ride from Union Square to Reservoir was 46 minutes; the published schedule’s median was 47 minutes.

Based on 3,133 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 46 minutes. That was within 1.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 53 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Union Square to Reservoir times by daypart

Off-peak produced the fastest median for Union Square to Reservoir; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

45 min 556 trips · 78% on pace

Midday

46 min 828 trips · 66% on pace

Evening rush

48 min 672 trips · 69% on pace

Off-peak

44 min 1,077 trips · 71% on pace

MEASUREMENT SAMPLE

How Union Square to Reservoir was measured

The Union Square to Reservoir estimate uses 3,133 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →