OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

StatetoNorth Station

Orange Line

A direct MBTA train from State to North Station took a median 1.8 minutes across 3,835 observed trips; 90% of measured rides finished within approximately 2.2 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical1.8 min50th percentile
Slower trip2.2 min90th percentile
Scheduled2.2 minmedian timetable
On pace100%within 2 min of schedule

THE SHORT ANSWER

How long does State to North Station take?

The median completed ride from State to North Station was 1.8 minutes; the published schedule’s median was 2.2 minutes.

Based on 3,835 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 1.8 minutes. That was within 0.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 2.2 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

State to North Station times by daypart

Evening rush produced the fastest median for State to North Station; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

1.8 min 705 trips · 100% on pace

Midday

1.8 min 678 trips · 99% on pace

Evening rush

1.8 min 746 trips · 100% on pace

Off-peak

1.8 min 1,706 trips · 100% on pace

MEASUREMENT SAMPLE

How State to North Station was measured

The State to North Station estimate uses 3,835 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.