OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

South StreettoChestnut Hill Avenue

Green Line

A direct MBTA train from South Street to Chestnut Hill Avenue took a median 1.8 minutes across 2,728 observed trips; 90% of measured rides finished within approximately 2.8 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical1.8 min50th percentile
Slower trip2.8 min90th percentile
Scheduled1.2 minmedian timetable
On pace99%within 2 min of schedule

THE SHORT ANSWER

How long does South Street to Chestnut Hill Avenue take?

The median completed ride from South Street to Chestnut Hill Avenue was 1.8 minutes; the published schedule’s median was 1.2 minutes.

Based on 2,728 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 1.8 minutes. That was 0.5 minutes longer than the published schedule.

Nine out of ten measured trips finished within approximately 2.8 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

South Street to Chestnut Hill Avenue times by daypart

Evening rush produced the fastest median for South Street to Chestnut Hill Avenue; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

1.8 min 509 trips · 99% on pace

Midday

1.8 min 730 trips · 99% on pace

Evening rush

1.8 min 540 trips · 99% on pace

Off-peak

1.8 min 949 trips · 99% on pace

MEASUREMENT SAMPLE

How South Street to Chestnut Hill Avenue was measured

The South Street to Chestnut Hill Avenue estimate uses 2,728 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →