OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

South StationtoCentral

Red Line

A direct MBTA train from South Station to Central took a median 8.2 minutes across 6,216 observed trips; 90% of measured rides finished within approximately 10 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical8.2 min50th percentile
Slower trip10 min90th percentile
Scheduled10 minmedian timetable
On pace97%within 2 min of schedule

THE SHORT ANSWER

How long does South Station to Central take?

The median completed ride from South Station to Central was 8.2 minutes; the published schedule’s median was 10 minutes.

Based on 6,216 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 8.2 minutes. That was within 2 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 10 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

South Station to Central times by daypart

Midday produced the fastest median for South Station to Central; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

8.2 min 1,416 trips · 99% on pace

Midday

8.2 min 1,301 trips · 97% on pace

Evening rush

8.8 min 1,368 trips · 97% on pace

Off-peak

8.2 min 2,131 trips · 95% on pace

MEASUREMENT SAMPLE

How South Station to Central was measured

The South Station to Central estimate uses 6,216 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →