OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Science Park/West EndtoWaban

Green Line

A direct train took 51 minutes on a typical trip. On a slower-than-usual trip, allow up to 59 minutes.

Typical51 min50th percentile
Slower trip59 min90th percentile
Scheduled53 minmedian timetable
On pace75%within 2 min of schedule

THE SHORT ANSWER

How long does Science Park/West End to Waban take?

Based on 3,120 direct trips between 2026-08-17 and 2026-09-15, the median observed ride was 51 minutes. That was within 2 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 59 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Time-of-day breakdown

Off-peak produced the fastest typical result in this window; Evening rush was slowest. Differences can change as the rolling dataset updates.

Morning rush

51 min 553 trips · 84% on pace

Midday

52 min 835 trips · 75% on pace

Evening rush

54 min 640 trips · 73% on pace

Off-peak

50 min 1,092 trips · 72% on pace

HOW TO READ THIS

Measured, not promised.

TransitMeter pairs vehicle stop timestamps with the schedule active for each trip. We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →