OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Park StreettoPrudential

Green Line

A direct MBTA train from Park Street to Prudential took a median 8.2 minutes across 3,657 observed trips; 90% of measured rides finished within approximately 10 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical8.2 min50th percentile
Slower trip10 min90th percentile
Scheduled10 minmedian timetable
On pace96%within 2 min of schedule

THE SHORT ANSWER

How long does Park Street to Prudential take?

The median completed ride from Park Street to Prudential was 8.2 minutes; the published schedule’s median was 10 minutes.

Based on 3,657 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 8.2 minutes. That was within 2 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 10 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Park Street to Prudential times by daypart

Off-peak produced the fastest median for Park Street to Prudential; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

8.2 min 766 trips · 97% on pace

Midday

8.2 min 921 trips · 95% on pace

Evening rush

8.8 min 723 trips · 98% on pace

Off-peak

7.8 min 1,247 trips · 96% on pace

MEASUREMENT SAMPLE

How Park Street to Prudential was measured

The Park Street to Prudential estimate uses 3,657 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →