OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Mission ParktoNorth Station

Green Line

A direct MBTA train from Mission Park to North Station took a median 30 minutes across 3,474 observed trips; 90% of measured rides finished within approximately 36 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical30 min50th percentile
Slower trip36 min90th percentile
Scheduled31 minmedian timetable
On pace76%within 2 min of schedule

THE SHORT ANSWER

How long does Mission Park to North Station take?

The median completed ride from Mission Park to North Station was 30 minutes; the published schedule’s median was 31 minutes.

Based on 3,474 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 30 minutes. That was within 1.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 36 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Mission Park to North Station times by daypart

Morning rush produced the fastest median for Mission Park to North Station; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

28 min 656 trips · 87% on pace

Midday

31 min 865 trips · 75% on pace

Evening rush

33 min 645 trips · 59% on pace

Off-peak

28 min 1,308 trips · 78% on pace

MEASUREMENT SAMPLE

How Mission Park to North Station was measured

The Mission Park to North Station estimate uses 3,474 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →