OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Mission ParktoArlington

Green Line

A direct MBTA train from Mission Park to Arlington took a median 18 minutes across 3,489 observed trips; 90% of measured rides finished within approximately 22 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical18 min50th percentile
Slower trip22 min90th percentile
Scheduled19 minmedian timetable
On pace82%within 2 min of schedule

THE SHORT ANSWER

How long does Mission Park to Arlington take?

The median completed ride from Mission Park to Arlington was 18 minutes; the published schedule’s median was 19 minutes.

Based on 3,489 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 18 minutes. That was within 1.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 22 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Mission Park to Arlington times by daypart

Off-peak produced the fastest median for Mission Park to Arlington; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

17 min 656 trips · 91% on pace

Midday

19 min 866 trips · 82% on pace

Evening rush

20 min 648 trips · 73% on pace

Off-peak

17 min 1,319 trips · 82% on pace

MEASUREMENT SAMPLE

How Mission Park to Arlington was measured

The Mission Park to Arlington estimate uses 3,489 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →