OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Magoun SquaretoMission Park

Green Line

A direct MBTA train from Magoun Square to Mission Park took a median 45 minutes across 3,385 observed trips; 90% of measured rides finished within approximately 52 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical45 min50th percentile
Slower trip52 min90th percentile
Scheduled46 minmedian timetable
On pace75%within 2 min of schedule

THE SHORT ANSWER

How long does Magoun Square to Mission Park take?

The median completed ride from Magoun Square to Mission Park was 45 minutes; the published schedule’s median was 46 minutes.

Based on 3,385 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 45 minutes. That was within 1.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 52 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Magoun Square to Mission Park times by daypart

Off-peak produced the fastest median for Magoun Square to Mission Park; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

45 min 680 trips · 81% on pace

Midday

46 min 839 trips · 74% on pace

Evening rush

47 min 676 trips · 71% on pace

Off-peak

43 min 1,190 trips · 76% on pace

MEASUREMENT SAMPLE

How Magoun Square to Mission Park was measured

The Magoun Square to Mission Park estimate uses 3,385 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →