OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Longwood Medical AreatoNorth Station

Green Line

A direct MBTA train from Longwood Medical Area to North Station took a median 23 minutes across 3,622 observed trips; 90% of measured rides finished within approximately 28 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical23 min50th percentile
Slower trip28 min90th percentile
Scheduled26 minmedian timetable
On pace89%within 2 min of schedule

THE SHORT ANSWER

How long does Longwood Medical Area to North Station take?

The median completed ride from Longwood Medical Area to North Station was 23 minutes; the published schedule’s median was 26 minutes.

Based on 3,622 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 23 minutes. That was within 3.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 28 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Longwood Medical Area to North Station times by daypart

Off-peak produced the fastest median for Longwood Medical Area to North Station; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

22 min 666 trips · 94% on pace

Midday

24 min 913 trips · 89% on pace

Evening rush

26 min 700 trips · 79% on pace

Off-peak

22 min 1,343 trips · 92% on pace

MEASUREMENT SAMPLE

How Longwood Medical Area to North Station was measured

The Longwood Medical Area to North Station estimate uses 3,622 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →