OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Gilman SquaretoMission Park

Green Line

A direct MBTA train from Gilman Square to Mission Park took a median 43 minutes across 3,401 observed trips; 90% of measured rides finished within approximately 49 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical43 min50th percentile
Slower trip49 min90th percentile
Scheduled44 minmedian timetable
On pace75%within 2 min of schedule

THE SHORT ANSWER

How long does Gilman Square to Mission Park take?

The median completed ride from Gilman Square to Mission Park was 43 minutes; the published schedule’s median was 44 minutes.

Based on 3,401 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 43 minutes. That was within 1.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 49 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Gilman Square to Mission Park times by daypart

Off-peak produced the fastest median for Gilman Square to Mission Park; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

43 min 680 trips · 81% on pace

Midday

44 min 827 trips · 72% on pace

Evening rush

45 min 690 trips · 71% on pace

Off-peak

41 min 1,204 trips · 75% on pace

MEASUREMENT SAMPLE

How Gilman Square to Mission Park was measured

The Gilman Square to Mission Park estimate uses 3,401 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →