OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Downtown CrossingtoJackson Square

Orange Line

A direct MBTA train from Downtown Crossing to Jackson Square took a median 10 minutes across 2,914 observed trips; 90% of measured rides finished within approximately 11 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical10 min50th percentile
Slower trip11 min90th percentile
Scheduled11 minmedian timetable
On pace98%within 2 min of schedule

THE SHORT ANSWER

How long does Downtown Crossing to Jackson Square take?

The median completed ride from Downtown Crossing to Jackson Square was 10 minutes; the published schedule’s median was 11 minutes.

Based on 2,914 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 10 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 11 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Downtown Crossing to Jackson Square times by daypart

Evening rush produced the fastest median for Downtown Crossing to Jackson Square; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

10 min 650 trips · 98% on pace

Midday

10 min 633 trips · 94% on pace

Evening rush

10 min 707 trips · 98% on pace

Off-peak

10 min 924 trips · 99% on pace

MEASUREMENT SAMPLE

How Downtown Crossing to Jackson Square was measured

The Downtown Crossing to Jackson Square estimate uses 2,914 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →