OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Downtown CrossingtoGreen Street

Orange Line

A direct MBTA train from Downtown Crossing to Green Street took a median 13 minutes across 2,916 observed trips; 90% of measured rides finished within approximately 15 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical13 min50th percentile
Slower trip15 min90th percentile
Scheduled14 minmedian timetable
On pace97%within 2 min of schedule

THE SHORT ANSWER

How long does Downtown Crossing to Green Street take?

The median completed ride from Downtown Crossing to Green Street was 13 minutes; the published schedule’s median was 14 minutes.

Based on 2,916 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 13 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 15 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Downtown Crossing to Green Street times by daypart

Evening rush produced the fastest median for Downtown Crossing to Green Street; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

13 min 650 trips · 98% on pace

Midday

13 min 633 trips · 92% on pace

Evening rush

13 min 707 trips · 98% on pace

Off-peak

13 min 926 trips · 98% on pace

MEASUREMENT SAMPLE

How Downtown Crossing to Green Street was measured

The Downtown Crossing to Green Street estimate uses 2,916 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →