OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Downtown CrossingtoCommunity College

Orange Line

A direct MBTA train from Downtown Crossing to Community College took a median 4.8 minutes across 3,839 observed trips; 90% of measured rides finished within approximately 5.2 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical4.8 min50th percentile
Slower trip5.2 min90th percentile
Scheduled6.2 minmedian timetable
On pace99%within 2 min of schedule

THE SHORT ANSWER

How long does Downtown Crossing to Community College take?

The median completed ride from Downtown Crossing to Community College was 4.8 minutes; the published schedule’s median was 6.2 minutes.

Based on 3,839 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 4.8 minutes. That was within 1.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 5.2 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Downtown Crossing to Community College times by daypart

Midday produced the fastest median for Downtown Crossing to Community College; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

4.8 min 712 trips · 98% on pace

Midday

4.8 min 677 trips · 98% on pace

Evening rush

5.2 min 744 trips · 100% on pace

Off-peak

4.8 min 1,706 trips · 99% on pace

MEASUREMENT SAMPLE

How Downtown Crossing to Community College was measured

The Downtown Crossing to Community College estimate uses 3,839 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →