OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Community CollegetoNorth Station

Orange Line

A direct MBTA train from Community College to North Station took a median 1.2 minutes across 3,822 observed trips; 90% of measured rides finished within approximately 1.2 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical1.2 min50th percentile
Slower trip1.2 min90th percentile
Scheduled2.2 minmedian timetable
On pace99%within 2 min of schedule

THE SHORT ANSWER

How long does Community College to North Station take?

The median completed ride from Community College to North Station was 1.2 minutes; the published schedule’s median was 2.2 minutes.

Based on 3,822 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 1.2 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 1.2 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Community College to North Station times by daypart

Evening rush produced the fastest median for Community College to North Station; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

1.2 min 812 trips · 100% on pace

Midday

1.2 min 648 trips · 100% on pace

Evening rush

1.2 min 748 trips · 97% on pace

Off-peak

1.2 min 1,614 trips · 100% on pace

MEASUREMENT SAMPLE

How Community College to North Station was measured

The Community College to North Station estimate uses 3,822 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →