OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

ChinatowntoGreen Street

Orange Line

A direct MBTA train from Chinatown to Green Street took a median 12 minutes across 2,908 observed trips; 90% of measured rides finished within approximately 13 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical12 min50th percentile
Slower trip13 min90th percentile
Scheduled13 minmedian timetable
On pace98%within 2 min of schedule

THE SHORT ANSWER

How long does Chinatown to Green Street take?

The median completed ride from Chinatown to Green Street was 12 minutes; the published schedule’s median was 13 minutes.

Based on 2,908 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 12 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 13 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Chinatown to Green Street times by daypart

Off-peak produced the fastest median for Chinatown to Green Street; Morning rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

12 min 641 trips · 98% on pace

Midday

12 min 639 trips · 94% on pace

Evening rush

12 min 699 trips · 99% on pace

Off-peak

12 min 929 trips · 99% on pace

MEASUREMENT SAMPLE

How Chinatown to Green Street was measured

The Chinatown to Green Street estimate uses 2,908 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →