OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

ChinatowntoDowntown Crossing

Orange Line

A direct MBTA train from Chinatown to Downtown Crossing took a median 1.2 minutes across 130 observed trips; 90% of measured rides finished within approximately 2.2 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical1.2 min50th percentile
Slower trip2.2 min90th percentile
Scheduled1.2 minmedian timetable
On pace97%within 2 min of schedule

THE SHORT ANSWER

How long does Chinatown to Downtown Crossing take?

The median completed ride from Chinatown to Downtown Crossing was 1.2 minutes; the published schedule’s median was 1.2 minutes.

Based on 130 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 1.2 minutes. That was within 0 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 2.2 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Chinatown to Downtown Crossing times by daypart

Evening rush produced the fastest median for Chinatown to Downtown Crossing; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

1.2 min 24 trips · 96% on pace

Midday

1.2 min 21 trips · 95% on pace

Evening rush

1.2 min 57 trips · 98% on pace

Off-peak

1.2 min 28 trips · 96% on pace

MEASUREMENT SAMPLE

How Chinatown to Downtown Crossing was measured

The Chinatown to Downtown Crossing estimate uses 130 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →