OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Chestnut HilltoFenway

Green Line

A direct train took 14 minutes on a typical trip. On a slower-than-usual trip, allow up to 17 minutes.

Typical14 min50th percentile
Slower trip17 min90th percentile
Scheduled15 minmedian timetable
On pace89%within 2 min of schedule

THE SHORT ANSWER

How long does Chestnut Hill to Fenway take?

Based on 3,365 direct trips between 2026-08-17 and 2026-09-15, the median observed ride was 14 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 17 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Time-of-day breakdown

Off-peak produced the fastest typical result in this window; Morning rush was slowest. Differences can change as the rolling dataset updates.

Morning rush

15 min 604 trips · 87% on pace

Midday

15 min 798 trips · 89% on pace

Evening rush

15 min 707 trips · 86% on pace

Off-peak

14 min 1,256 trips · 90% on pace

HOW TO READ THIS

Measured, not promised.

TransitMeter pairs vehicle stop timestamps with the schedule active for each trip. We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →