OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

CentraltoSouth Station

Red Line

A direct MBTA train from Central to South Station took a median 8.8 minutes across 6,271 observed trips; 90% of measured rides finished within approximately 11 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical8.8 min50th percentile
Slower trip11 min90th percentile
Scheduled9.2 minmedian timetable
On pace93%within 2 min of schedule

THE SHORT ANSWER

How long does Central to South Station take?

The median completed ride from Central to South Station was 8.8 minutes; the published schedule’s median was 9.2 minutes.

Based on 6,271 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 8.8 minutes. That was within 0.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 11 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Central to South Station times by daypart

Morning rush produced the fastest median for Central to South Station; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

8.2 min 1,318 trips · 94% on pace

Midday

8.8 min 1,632 trips · 93% on pace

Evening rush

9.2 min 1,329 trips · 89% on pace

Off-peak

8.2 min 1,992 trips · 93% on pace

MEASUREMENT SAMPLE

How Central to South Station was measured

The Central to South Station estimate uses 6,271 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →