OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

CentraltoDowntown Crossing

Red Line

A direct MBTA train from Central to Downtown Crossing took a median 7.2 minutes across 6,253 observed trips; 90% of measured rides finished within approximately 9.2 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical7.2 min50th percentile
Slower trip9.2 min90th percentile
Scheduled8.2 minmedian timetable
On pace95%within 2 min of schedule

THE SHORT ANSWER

How long does Central to Downtown Crossing take?

The median completed ride from Central to Downtown Crossing was 7.2 minutes; the published schedule’s median was 8.2 minutes.

Based on 6,253 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 7.2 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 9.2 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Central to Downtown Crossing times by daypart

Off-peak produced the fastest median for Central to Downtown Crossing; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

7.2 min 1,315 trips · 97% on pace

Midday

7.2 min 1,626 trips · 96% on pace

Evening rush

7.8 min 1,327 trips · 90% on pace

Off-peak

6.8 min 1,985 trips · 95% on pace

MEASUREMENT SAMPLE

How Central to Downtown Crossing was measured

The Central to Downtown Crossing estimate uses 6,253 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →