OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Brookline VillagetoPark Street

Green Line

A direct MBTA train from Brookline Village to Park Street took a median 20 minutes across 3,328 observed trips; 90% of measured rides finished within approximately 25 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical20 min50th percentile
Slower trip25 min90th percentile
Scheduled21 minmedian timetable
On pace82%within 2 min of schedule

THE SHORT ANSWER

How long does Brookline Village to Park Street take?

The median completed ride from Brookline Village to Park Street was 20 minutes; the published schedule’s median was 21 minutes.

Based on 3,328 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 20 minutes. That was within 1.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 25 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Brookline Village to Park Street times by daypart

Morning rush produced the fastest median for Brookline Village to Park Street; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

19 min 619 trips · 89% on pace

Midday

20 min 792 trips · 84% on pace

Evening rush

21 min 679 trips · 68% on pace

Off-peak

19 min 1,238 trips · 84% on pace

MEASUREMENT SAMPLE

How Brookline Village to Park Street was measured

The Brookline Village to Park Street estimate uses 3,328 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →