OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

BroadwaytoSavin Hill

Red Line

A direct MBTA train from Broadway to Savin Hill took a median 6.2 minutes across 3,140 observed trips; 90% of measured rides finished within approximately 7.8 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical6.2 min50th percentile
Slower trip7.8 min90th percentile
Scheduled7.2 minmedian timetable
On pace96%within 2 min of schedule

THE SHORT ANSWER

How long does Broadway to Savin Hill take?

The median completed ride from Broadway to Savin Hill was 6.2 minutes; the published schedule’s median was 7.2 minutes.

Based on 3,140 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 6.2 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 7.8 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Broadway to Savin Hill times by daypart

Evening rush produced the fastest median for Broadway to Savin Hill; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

6.2 min 603 trips · 99% on pace

Midday

6.2 min 855 trips · 94% on pace

Evening rush

6.2 min 679 trips · 97% on pace

Off-peak

6.2 min 1,003 trips · 95% on pace

MEASUREMENT SAMPLE

How Broadway to Savin Hill was measured

The Broadway to Savin Hill estimate uses 3,140 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →