OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Brigham CircletoNorth Station

Green Line

A direct MBTA train from Brigham Circle to North Station took a median 25 minutes across 3,479 observed trips; 90% of measured rides finished within approximately 30 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical25 min50th percentile
Slower trip30 min90th percentile
Scheduled28 minmedian timetable
On pace89%within 2 min of schedule

THE SHORT ANSWER

How long does Brigham Circle to North Station take?

The median completed ride from Brigham Circle to North Station was 25 minutes; the published schedule’s median was 28 minutes.

Based on 3,479 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 25 minutes. That was within 3.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 30 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Brigham Circle to North Station times by daypart

Morning rush produced the fastest median for Brigham Circle to North Station; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

24 min 656 trips · 94% on pace

Midday

26 min 848 trips · 89% on pace

Evening rush

28 min 664 trips · 77% on pace

Off-peak

24 min 1,311 trips · 92% on pace

MEASUREMENT SAMPLE

How Brigham Circle to North Station was measured

The Brigham Circle to North Station estimate uses 3,479 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →