OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Ball SquaretoHeath Street

Green Line

A direct MBTA train from Ball Square to Heath Street took a median 51 minutes across 2,855 observed trips; 90% of measured rides finished within approximately 59 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical51 min50th percentile
Slower trip59 min90th percentile
Scheduled52 minmedian timetable
On pace70%within 2 min of schedule

THE SHORT ANSWER

How long does Ball Square to Heath Street take?

The median completed ride from Ball Square to Heath Street was 51 minutes; the published schedule’s median was 52 minutes.

Based on 2,855 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 51 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 59 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Ball Square to Heath Street times by daypart

Off-peak produced the fastest median for Ball Square to Heath Street; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

52 min 579 trips · 74% on pace

Midday

52 min 701 trips · 68% on pace

Evening rush

54 min 565 trips · 66% on pace

Off-peak

49 min 1,010 trips · 70% on pace

MEASUREMENT SAMPLE

How Ball Square to Heath Street was measured

The Ball Square to Heath Street estimate uses 2,855 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →