OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Back of the HilltoNorth Station

Green Line

A direct MBTA train from Back of the Hill to North Station took a median 33 minutes across 3,458 observed trips; 90% of measured rides finished within approximately 39 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical33 min50th percentile
Slower trip39 min90th percentile
Scheduled34 minmedian timetable
On pace74%within 2 min of schedule

THE SHORT ANSWER

How long does Back of the Hill to North Station take?

The median completed ride from Back of the Hill to North Station was 33 minutes; the published schedule’s median was 34 minutes.

Based on 3,458 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 33 minutes. That was within 1.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 39 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Back of the Hill to North Station times by daypart

Off-peak produced the fastest median for Back of the Hill to North Station; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

32 min 634 trips · 86% on pace

Midday

34 min 860 trips · 74% on pace

Evening rush

36 min 664 trips · 52% on pace

Off-peak

30 min 1,300 trips · 79% on pace

MEASUREMENT SAMPLE

How Back of the Hill to North Station was measured

The Back of the Hill to North Station estimate uses 3,458 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →