OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Back BaytoNorth Station

Orange Line

A direct MBTA train from Back Bay to North Station took a median 7.2 minutes across 2,952 observed trips; 90% of measured rides finished within approximately 8.2 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical7.2 min50th percentile
Slower trip8.2 min90th percentile
Scheduled8.2 minmedian timetable
On pace98%within 2 min of schedule

THE SHORT ANSWER

How long does Back Bay to North Station take?

The median completed ride from Back Bay to North Station was 7.2 minutes; the published schedule’s median was 8.2 minutes.

Based on 2,952 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 7.2 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 8.2 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Back Bay to North Station times by daypart

Midday produced the fastest median for Back Bay to North Station; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

7.2 min 674 trips · 99% on pace

Midday

7.2 min 684 trips · 97% on pace

Evening rush

7.8 min 664 trips · 99% on pace

Off-peak

7.2 min 930 trips · 98% on pace

MEASUREMENT SAMPLE

How Back Bay to North Station was measured

The Back Bay to North Station estimate uses 2,952 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →