OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Amory StreettoWarren Street

Green Line

A direct MBTA train from Amory Street to Warren Street took a median 10 minutes across 3,427 observed trips; 90% of measured rides finished within approximately 12 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical10 min50th percentile
Slower trip12 min90th percentile
Scheduled11 minmedian timetable
On pace97%within 2 min of schedule

THE SHORT ANSWER

How long does Amory Street to Warren Street take?

The median completed ride from Amory Street to Warren Street was 10 minutes; the published schedule’s median was 11 minutes.

Based on 3,427 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 10 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 12 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Amory Street to Warren Street times by daypart

Morning rush produced the fastest median for Amory Street to Warren Street; Evening rush produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

9.2 min 627 trips · 99% on pace

Midday

10 min 887 trips · 97% on pace

Evening rush

11 min 664 trips · 96% on pace

Off-peak

10 min 1,249 trips · 96% on pace

MEASUREMENT SAMPLE

How Amory Street to Warren Street was measured

The Amory Street to Warren Street estimate uses 3,427 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →