OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Amory StreettoSouth Street

Green Line

A direct MBTA train from Amory Street to South Street took a median 20 minutes across 3,416 observed trips; 90% of measured rides finished within approximately 23 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical20 min50th percentile
Slower trip23 min90th percentile
Scheduled21 minmedian timetable
On pace89%within 2 min of schedule

THE SHORT ANSWER

How long does Amory Street to South Street take?

The median completed ride from Amory Street to South Street was 20 minutes; the published schedule’s median was 21 minutes.

Based on 3,416 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 20 minutes. That was within 1 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 23 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Amory Street to South Street times by daypart

Morning rush produced the fastest median for Amory Street to South Street; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

19 min 620 trips · 92% on pace

Midday

20 min 887 trips · 92% on pace

Evening rush

20 min 665 trips · 90% on pace

Off-peak

21 min 1,244 trips · 85% on pace

MEASUREMENT SAMPLE

How Amory Street to South Street was measured

The Amory Street to South Street estimate uses 3,416 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →