OBSERVED MBTA TRAVEL TIME · 30 SERVICE DAYS

Amory StreettoChestnut Hill Avenue

Green Line

A direct MBTA train from Amory Street to Chestnut Hill Avenue took a median 18 minutes across 3,420 observed trips; 90% of measured rides finished within approximately 21 minutes.

Source: MBTA Performance Data · 2026-08-20 to 2026-09-18 · Completed direct trips only

Typical18 min50th percentile
Slower trip21 min90th percentile
Scheduled19 minmedian timetable
On pace92%within 2 min of schedule

THE SHORT ANSWER

How long does Amory Street to Chestnut Hill Avenue take?

The median completed ride from Amory Street to Chestnut Hill Avenue was 18 minutes; the published schedule’s median was 19 minutes.

Based on 3,420 direct trips between 2026-08-20 and 2026-09-18, the median observed ride was 18 minutes. That was within 1.5 minutes of the published schedule.

Nine out of ten measured trips finished within approximately 21 minutes. These figures describe completed direct trips; they do not include the time spent waiting for the train.

WHEN YOU TRAVEL

Amory Street to Chestnut Hill Avenue times by daypart

Morning rush produced the fastest median for Amory Street to Chestnut Hill Avenue; Off-peak produced the slowest.

Differences can change as the rolling dataset updates.

Morning rush

17 min 622 trips · 95% on pace

Midday

18 min 888 trips · 95% on pace

Evening rush

18 min 664 trips · 94% on pace

Off-peak

18 min 1,246 trips · 87% on pace

MEASUREMENT SAMPLE

How Amory Street to Chestnut Hill Avenue was measured

The Amory Street to Chestnut Hill Avenue estimate uses 3,420 completed direct-trip stop-timestamp pairs matched to the schedule active for each observed train.

We publish the median because one dramatic delay should not define an everyday journey, and the 90th percentile because riders still need to understand the bad end of normal.

We do not infer why a trip ran slowly. Construction, incidents, crowding and weather require separate evidence.

Read the complete method →